by Watchman » 02 Jan 2025 12:25

It takes approximately 700,000 megawatt hours of electricity to power Chicago’s more than 400 municipal buildings every year. As of January 1, every single one of them — including 98 fire stations, two international airports, and two of the largest water treatment plants on the planet — is running on renewable energy, thanks largely to Illinois’ newest and largest solar farm.
READ FULL ARTICLE
[img]https://grist.org/wp-content/uploads/2024/12/241224_DoubleBlackDiamond.jpg?resize=1200%2C675&quality=75&strip=all[/img]
It takes approximately 700,000 megawatt hours of electricity to power Chicago’s more than 400 municipal buildings every year. As of January 1, every single one of them — including 98 fire stations, two international airports, and two of the largest water treatment plants on the planet — is running on renewable energy, thanks largely to Illinois’ newest and largest solar farm. [b][size=150][url=https://grist.org/cities/chicago-renewable-energy-black-diamond-solar/]READ FULL ARTICLE[/url][/size][/b]